Mitek trusses are reliable every mitek truss has been individu.
Mitek floor truss fire code.
The wide flange width 2 5 or 3 5 assure a large surface to apply the subfloor adhesive and contribute to a better sub floor sheathing support.
Your site erection time is greatly reduced and dollar losses from job site material shortages and pilferage are eliminat ed.
Within the mitek engineering software lumber with a t following it is fire treated lumber.
Check our our posistrut app an electronic catalogue giving instant access to information about posistrut roof and floor trusses.
Mitek floor truss engineered floor system have a wide nailing surface that speeds up installation of the structural elements and floor sheathing.
Mitek trusses save money because costs are known in advance there s no guesswork.
It contains the latest installation guides case studies and links to short instructional videos demonstrating the amazing versatility of this ingenious truss.
When selecting posi strut trusses consideration should be given to the springiness of the floor.
Mitek has expanded the fwh fire wall hanger series to include the higher load carrying capacity fwhbp the fire wall hanger for beams and purlins.
Posi strut floor trusses are designed to conform to the vibration requirements of the new zealand building standard as nzs 1170.
2015 2018 ibc irc code complaint the fwh fire wall hanger is designed for attaching truss i joist solid sawn lumber or engineered wood floor framing members to double wall top plates or minimum 2 ply 2x solid sawn header fire rated wood frame walls.
Generally the floor stiffness provided by trusses selected from the tables and designed in mitek.
Lumber with a p following it is pressure treated and lumber with an i following it is incised pressure treated.
A mitek engineered roof or floor truss ensures quality and efficiency.
Mitek is a global company focused on providing integrated software services engineered products and automated solutions for the building industry worldwide.
The fwhbp transfers the load into the supporting wall thru bearing on the top plates and directly attaching to the stud pack or post below.